I picked up a 21' above ground pool for the kids. Got it for free. I didn't have the cash to pay someone to excavate the spot so I am digging out the spot and leveling it BY HAND! Once I stripped off the layer of topsoil I got down to the business of removing the clay and rock with PICK, SHOVEL AND WHEELBARROW!
Not my Idea of fun, but hey...I've lost an additional 3-1/2 lbs. in the last week.
I was having trouble getting out of the low 190's and I weighed in at 189 today!!! My kids think I'm crazy doing it by hand, but I told them If I could find a contractor to do it, It would probably be 2-3 weeks before thay would come out and get it done. By that time I will have it up and installed and I'll be that much leaner when I'm ready for the innaugural swim!
Jack W.
SW 214
today...189
GW 175
5'6 48 YOM.
Not my Idea of fun, but hey...I've lost an additional 3-1/2 lbs. in the last week.
I was having trouble getting out of the low 190's and I weighed in at 189 today!!! My kids think I'm crazy doing it by hand, but I told them If I could find a contractor to do it, It would probably be 2-3 weeks before thay would come out and get it done. By that time I will have it up and installed and I'll be that much leaner when I'm ready for the innaugural swim!
Jack W.
SW 214
today...189
GW 175
5'6 48 YOM.




Comment